Home/Supply/Commercial Solar
Supply — Commercial Solar

Solar equipment, released on schedule.

Balance-of-system supply for commercial and utility-scale solar in Arizona. Tech Energy America supplies UL-listed switchgear built in-house, JST pad-mount transformers, MV cable, building wire, conduit and fittings to solar EPCs, developers and electrical contractors — held in our inventory and released per the EPC's schedule.

BuyersEPCs · Developers
TransformersJST 500–3,500 kVA
SwitchgearUL · Built In-House
ReleasesStaged to Schedule
— Solar supply

Six supply lines, one quote.

We supply the electrical balance of system for commercial and utility-scale solar across Arizona — the switchgear, transformers, wire, conduit and distribution equipment between the array and the utility. Our customers are the EPCs, developers and electrical contractors who build and install the systems.

— Rooftop & C&I
Rooftop Solar

Wire, conduit and fittings, disconnects, breakers and panelboards for rooftop arrays on offices, warehouses, retail centers and industrial buildings — quoted from the contractor's takeoff.

Office / RetailWarehouseIndustrial Roof
— Utility-scale
Ground-Mount Farms

MV cable for collector lines, pad-mount transformers and switchgear for ground-mount projects on industrial, agricultural and land-development sites — released in stages tied to the EPC's construction milestones.

Utility-ScaleAgriculturalMV Cable
— Demand mgmt + backup
Solar + Storage

Switchgear, breakers, transformers and cable for projects pairing solar with battery energy storage, scheduled so equipment arrives when the site is ready to receive it.

BESSDemand ReductionBackup Power
— Generate + shade
Solar Carports

Feeder wire, conduit, panelboards and breakers for solar carport arrays at shopping centers, corporate campuses and fleet yards, including the circuits for EV charging equipment.

Shopping CentersCorporate CampusEV-Ready
— Built in-house
UL Switchgear

UL-listed low-voltage switchgear built in our own factory, 400–1200A, with draw-out or fixed-mount breakers and custom bus arrangements for solar interconnection points.

400–1200ASwitchgearInterconnection
— APS · SRP · TEP
Staged Releases

Material is held in our inventory and released per the EPC's schedule — cable synced to trenching, transformers ordered early, switchgear delivered when the site is ready — so the job does not carry on-site storage risk.

Cable ReleasesInterconnectionJust-in-Time
— Why EPCs buy from us

Long-lead gear, ordered early.

On solar jobs the schedule is set by the longest-lead equipment, not the modules. We are manufacturer-authorized in Arizona for JST Power, CME Wire, Priority Wire and Southwire, build UL-listed switchgear in-house, and quote all of it on one takeoff.

01
— Transformers

JST Pad-Mount

JST pad-mount transformers, 500 to 3,500 kVA, with ready-to-ship inventory in a market where lead times are quoted in months.

02
— Wire & cable

MV & Building Wire

MV cable, building wire and PV-project constructions from CME Wire, Priority Wire and Southwire, cut-to-length or on reels.

03
— Switchgear

UL Listed, Built In-House

Low-voltage switchgear and panelboards built in our own factory when the catalogs do not cover the spec.

04
— Releases

Staged Delivery

Inventory held and released per the EPC's schedule, so material is not baking on a job site for weeks.

— Who buys from us

Warehouses, agriculture, and beyond.

We supply solar EPCs, developers and electrical contractors building systems for warehouses and distribution centers, manufacturing facilities, office buildings, retail and shopping centers, hospitality, agriculture, mining operations, schools and universities, healthcare facilities, and government buildings.

Office: 15169 N Scottsdale Rd, Ste 205, Scottsdale, AZ 85254. Send a takeoff, single-line or BOM for a written quote with lead times.

Warehouses & DistributionManufacturingOffice BuildingsRetail & Shopping CentersHospitality & HotelsAgricultureMining OperationsSchools & UniversitiesHealthcare FacilitiesGovernment BuildingsFleet / LogisticsSelf-Storage
— Projects we've supplied

Real orders for real solar jobs.

A few recent material orders for Solar Gain, a solar contractor based in Tucson. Quantities and dates come from the purchase orders, invoices and packing slips on file.

Solar Gain Inc · Hotel project · Nogales, AZ

Two wire orders for one hotel job

What we supplied
7,000 ft of #10 XHHW-2 green 1000V copper on 500-ft reels, then 14,000 ft of 10 AWG PV wire (black, 1kV/2kV, 19-strand copper).
What made it work
The second order went from purchase order (May 28, 2026) to a signed packing slip (June 3, 2026) in six days.
Solar Gain Inc · Commercial project · Rio Rico, AZ

Red and black PV wire, shipped with freight

What we supplied
4,000 ft of black and 3,000 ft of red 10 AWG PV wire (1kV/2kV, 19-strand copper), freight included.
What made it work
Ordered the same day as the Nogales job (May 28, 2026) and sourced together, with each PO invoiced separately as Solar Gain requires. Invoiced June 3, 2026.
Solar Gain West · Laundry facility · Sacramento, CA

30,000 ft of wire on full 2,500-ft reels

What we supplied
15,000 ft black and 10,000 ft red 10 AWG RHH/RHW-2 PV wire, plus 5,000 ft of #10 XHHW-2 green — 12 reels of 2,500 ft.
What made it work
Every line was confirmed in stock at the supplier's Las Vegas warehouse when the PO was issued (June 19, 2026), ahead of the July 1, 2026 need-by date.

Tech Energy America supplies the materials. Send your BOM or material list for a written quote with lead times.

Running materials for a solar job?

Send the takeoff, single-line or BOM and the construction schedule. We quote switchgear, transformers, cable and BOS material with lead times and a staged release plan. Need it installed? Installation is handled by our sister company, ConstruTech Group — Tech Energy America supplies the materials.